ANALISA PENGOPERASIAN 1 CWP DAN 2 CWP PADA COOLING WATER SYSTEM PLTU ASAM ASAM UNIT 4

Hartanto, Juni EkoTamjidillah, Mastiadi
Scientific Journal of Mechanical Engineering Kinematika (Sinta 3)Vol. 0 No. 016 Desember 2019
DOI10.20527/sjmekinematika.v4i2.111

Abstrak

Electric power is used to support daily life, therefore electrical energy must be continually developed considering the increasing need for this energy. Therefore it is necessary to do preventive, corrective maintenance and efforts to optimize the generating unit such as savings in the production process, one of which is by analyzing the operation of a Circulating Water Pump CWP at the Unit 4 Acid-Acid Power Plant. The formulation of the problem in this study is that in the manufacturer's design for 65 MW full load 2 CWP pumps are needed, this can be seen from the pump specification data, but in fact with only a Circulating Water Pump CWP can produce a full load of 65 MW.

Kata Kunci

Tara CalorThermal EfficiencyNet Power and Own UseVacuum Pressure and Main Steam Flow

Cari jurnal yang tepat untuk naskah Anda

MatchMind AI mencocokkan abstrak naskah Anda dengan ribuan jurnal terakreditasi dan menampilkan rekomendasi terbaik beserta alasannya.

Coba MatchMind

Lihat profil lengkap jurnal ini

Waktu review, biaya APC, statistik sitasi, indeksasi Scopus, dan banyak lagi.

Buka Scientific Journal of Mechanical Engineering Kinematika

Artikel ini juga tersedia di situs resmi jurnal.

ANALISA PENGOPERASIAN 1 CWP DAN 2 CWP PADA COOLING WATER SYSTEM PLTU ASAM ASAM UNIT 4 | Scientific Journal of Mechanical Engineering Kinematika | Publiora