Publiora

Menghubungkan ke Publiora...

Publiora

Pengendalian Waktu Produksi Balok Girder Dengan Menggunakan Metode CPM dan LoB

Christofer, ChristoferAnisah, AnisahPurnomo, Adhi
Menara: Jurnal Teknik Sipil (Sinta 4)Vol. 0 No. 031 Juli 2018
DOI10.21009/jmenara.v13i2.18068

Abstrak

This research is purpose to control time in Girder beam production using CPM (Criticial Paht Method) and LoB (Line of Balance) to get maximum productions amount with  time adaptability precisely. This research is using count method and management of secondary and primary data that illustrated to graphic and diagram. Case study at project of building the overpass LRT (Light Rail Transit), to productions girder beam at PT. Adhi Karya Factory Precast Sentul. The result of this research shows that productions capability girder beam increase as much 21 unit girder beam per mount with speed track 59,4268 unit per hour, balance delay 42,3678 %, line efficiency 42,267 with time cycle that using is 68,5 hour in first cycle, 69 hours in second cycle, 69 hours in third cycle, 69 hours in fourth cycle and having waiting time that happen to every trun of cycle is one hour. So that the result of research can declare is happen productions acceleration with using CPM (Criticial Paht Method) and LoB (Line of Balance) is 10 hour per mount.

Kata Kunci

Line of BalanceCritical Paht MethodProduction Analysis

Cari jurnal yang tepat untuk naskah Anda

MatchMind AI mencocokkan abstrak naskah Anda dengan ribuan jurnal terakreditasi dan menampilkan rekomendasi terbaik beserta alasannya.

Coba MatchMind

Lihat profil lengkap jurnal ini

Waktu review, biaya APC, statistik sitasi, indeksasi Scopus, dan banyak lagi.

Buka Menara: Jurnal Teknik Sipil

Artikel ini juga tersedia di situs resmi jurnal.

Pengendalian Waktu Produksi Balok Girder Dengan Menggunakan Metode CPM dan LoB | Menara: Jurnal Teknik Sipil | Publiora