Manajemen Risiko Proyek Pembangunan Underpass Gatot Subroto Denpasar

Pertiwi, I Gusti Agung Istri MasKristinayanti, Wayan SriAryawan, I Gede Made Oka
Jurnal Akuntansi, Ekonomi dan Manajemen Bisnis (Sinta 3)Vol. 0 No. 04 Juli 2016
DOI10.30871/jaemb.v4i1.77

Abstrak

The developmet of construction projects found many uncertainties that are difficult to predict, so as it is necessary to analyze the risks. Early identification of risks that were identified in this study was 102 to 83 risks and relevant risk. Research using qualitative and quantitative methods with the stage of identifiying the risk of possible risks, risk assessment and risk maping to determine the risks classified as extreme risk, high risk, moderate risk or low risk. Creation of risk maps and the determination of risk category as a reference for decision making risk management measures. 83 shows the results of the relevant risks are risks that are categorized as 25 extreme riks, with the percentage of 44 sourced from project risk, 16% from tecnic risk, 12% from safety risk, 8% from economic and planning, 4% from environtment risk, nature risk and criminal risk. And as 26 high risk, with the percentage of 31 sourced from project risk, 19% from tecnic and environment, 12% from planning risk, 8% from economic risk, 4% from politic risk, human risk and safety risk.

Kata Kunci

risk identificationrisk assessmentmitigation and risk allocation

Cari jurnal yang tepat untuk naskah Anda

MatchMind AI mencocokkan abstrak naskah Anda dengan ribuan jurnal terakreditasi dan menampilkan rekomendasi terbaik beserta alasannya.

Coba MatchMind

Lihat profil lengkap jurnal ini

Waktu review, biaya APC, statistik sitasi, indeksasi Scopus, dan banyak lagi.

Buka Jurnal Akuntansi, Ekonomi dan Manajemen Bisnis

Artikel ini juga tersedia di situs resmi jurnal.

Manajemen Risiko Proyek Pembangunan Underpass Gatot Subroto Denpasar | Jurnal Akuntansi, Ekonomi dan Manajemen Bisnis | Publiora