Publiora

Menghubungkan ke Publiora...

Publiora

Determining the Pareto front of distributed generator and static VAR compensator units placement in distribution networks

Ahmadi, BahmanÇağlar, Ramazan
International Journal of Electrical and Computer Engineering (IJECE) (Sinta 1)Vol. 0 No. 01 Agustus 2022
DOI10.11591/ijece.v12i4.pp3440-3453

Abstrak

The integration of distributed generators (DGs), which are based on renewable energy sources, energy storage systems, and static VAR compensators (SVCs), requires considering more challenging operational cases due to the variability of DG production contributed by different characteristics for different time sequences. The size, quantity, technology, and location of DG units have major effects on the system to benefit from the integration. All these aspects create a multi-objective scope; therefore, it is considered a multi-objective mixed-integer optimization problem. This paper presents an improved multi-objective salp swarm optimization algorithm (MOSSA) to obtain multiple Pareto efficient solutions for the optimal number, location, and capacity of DGs and the controlling strategy of SVC a radial distribution system. MOSSA is a bio-inspired optimizer based on swarm intelligence techniques and it is used in finding the optimal solution for a global optimization problem. Two sets of objective functions have been formulated minimizing DGs and SVC cost, voltage violation, energy losses, and system emission cost. The usefulness of the proposed MOSSA has been tested with the 33-bus and 141-bus radial distribution systems and the qualitative comparisons against two well-known algorithms, multiple objective evolutionary algorithms based on decomposition (MOEA/D), and multiple objective particle swarm optimization (MOPSO) algorithm.

Kata Kunci

multi-objective salp swarmoptimal planningoptimization algorithmpareto efficientphotovoltaicpower distribution planningwind power generation

Cari jurnal yang tepat untuk naskah Anda

MatchMind AI mencocokkan abstrak naskah Anda dengan ribuan jurnal terakreditasi dan menampilkan rekomendasi terbaik beserta alasannya.

Coba MatchMind

Lihat profil lengkap jurnal ini

Waktu review, biaya APC, statistik sitasi, indeksasi Scopus, dan banyak lagi.

Buka International Journal of Electrical and Computer Engineering (IJECE)

Artikel ini juga tersedia di situs resmi jurnal.

Determining the Pareto front of distributed generator and static VAR compensator units placement in distribution networks | International Journal of Electrical and Computer Engineering (IJECE) | Publiora