Developing Resilient Power Supply. Case Study: CVM Corp's Eastern Block

Erni Nur'AinyInstitut Teknologi Bandung, Bandung, IndonesiaAkbar Adhi UtamaInstitut Teknologi Bandung, Bandung, Indonesia
Dinasti International Journal of Education Management and Social Science (Sinta 2)No. 1 (2026)8 Juni 2025hal. 3443-3457
DOI10.38035/dijemss.v6i5.4712

Abstrak

This research aims to develop a strategic plan for power infrastructure to support the expansion of production capacity at CVM CORP, with a particular focus on the Eastern Block. The implementation of Eco Mechanized Mining has encountered several key obstacles, including insufficient power supply capacity, high operational electricity costs, slow response to power outages, and significant delays in the development of a new Switching Station (SS), which has been under planning since 2018. Through Current Reality Tree (CRT) analysis, the main root cause was identified as the overreliance on SS TEU as the sole power source for the entire operational zone. To address these issues, the proposed strategy includes the development of a new Switching Station near the company’s PLTU (steam power plant), determination of the optimal site using the Analytic Hierarchy Process (AHP), project scheduling via the Critical Path Method (CPM), cost-efficiency evaluation using full costing and the Levelized Cost of Electricity (LCOE), and investment feasibility analysis utilizing IRR, NPV, and Payback Period metrics. Additionally, the load distribution between SS TEU and the proposed new SS has been redesigned to enhance power efficiency and lower electricity expenses. The results show that a hybrid electricity supply model (PLN–PLTU) substantially reduces electricity costs and helps achieve production targets. The investment also demonstrates strong financial viability, with an IRR of 1398%, a Net Present Value (NPV) exceeding IDR 4.47 trillion, and a payback period of just one year. Project implementation is targeted to start by July 19, 2025, and be completed before October 21, 2026, with continuous risk mitigation throughout the execution phase. This comprehensive strategy ensures greater reliability of the power system and strengthens long-term operational resilience for CVM CORP.

Kata Kunci

Power infrastructureSwitching StationLevelized Cost of Electricity (LCOE)Analytic Hierarchy Process (AHP)Critical Path Method (CPM)Investment FeasibilityRisk ManagementPower infrastructureSwitching StationLevelized Cost of Electricity (LCOE)Analytic Hierarchy Process (AHP)Critical Path Method (CPM)Investment FeasibilityRisk Management

Cari jurnal yang tepat untuk naskah Anda

MatchMind AI mencocokkan abstrak naskah Anda dengan ribuan jurnal terakreditasi dan menampilkan rekomendasi terbaik beserta alasannya.

Coba MatchMind

Lihat profil lengkap jurnal ini

Waktu review, biaya APC, statistik sitasi, indeksasi Scopus, dan banyak lagi.

Buka Dinasti International Journal of Education Management and Social Science

Artikel ini juga tersedia di situs resmi jurnal.

Developing Resilient Power Supply. Case Study: CVM Corp's Eastern Block | Dinasti International Journal of Education Management and Social Science | Publiora